Standard Operating Time
Standard Operating Time(For Light/Mid Color)
Operation
|
Time
|
Water Fill
|
3 Min
|
Scouring Chemical Inject
|
3 Min
|
Fabric Load
|
20 Min
|
Caustic Dosing
|
8 Min
|
Tem Up, Scouring (98X45)
|
50 Min
|
Tem Down ,Drain
|
8 Min
|
Wash
|
15 Min
|
Fill + PR Inject + Run 10 Min + Wash
|
25 Min
|
Fill + Acid Inject + Run 10 Min
|
14 Min
|
Enzyme + (Hot 80X10Min) + Wash
|
70 Min
|
Fill + Leveling + Salt Inject
+ Run 10 Min
|
20 Min
|
Color Dosing 25 Min + Run 10 Min
|
35 Min
|
Soda Dosing
|
45 Min
|
Color Steam 60 Min + B/D + Wash 10 Min
|
80 Min
|
Fill + Acid + Run 10 Min + Drain
|
14 Min
|
Fill + Soaping Inject + Run
|
50 Min (Maximum)
|
Wash 2 X 10 Min
|
30 Min
|
Fill + Fixing + Drain
|
15 Min
|
Softener Dosing + Run Time
|
30 Min
|
Unload + Water Drain
|
20 Min
|
|
550 Min/9hr 10 min
|
Standard Operating Time(For Deep Color)
Operation
|
Time
|
Water Fill
|
3 Min
|
Scouring Chemical Inject
|
3 Min
|
Fabric Load
|
20 Min
|
Caustic Dosing
|
8 Min
|
Tem Up, Scouring (98X45)
|
50 Min
|
Tem Down ,Drain
|
8 Min
|
Wash
|
15 Min
|
Fill + PR Inject + Run 10 Min + Wash
|
25 Min
|
Fill + Acid Inject + Run 10 Min
|
14 Min
|
Enzyme + (Hot 80X10Min) + Wash
|
70 Min
|
Fill + Leveling + Salt Inject
+ Run 10 Min
|
20 Min
|
Color Dosing 25 Min + Run 10 Min
|
35 Min
|
Soda Dosing
|
45 Min
|
Color Steam 60 Min + B/D + Wash 10 Min
|
80 Min
|
Fill + Acid + Run 10 Min + Drain
|
14 Min
|
Fill + Soaping Inject + Run
|
70 Min (Maximum)
|
Wash 2 X 10 Min
|
30 Min
|
Fill + Fixing + Drain
|
25 Min
|
Softener Dosing + Run Time
|
30 Min
|
Unload + Water Drain
|
20 Min
|
|
585 Min/9hr 45 min
|
Standard Operating Time(For Turquoise/R Special
Color)
Operation
|
Time
|
Water Fill
|
3 Min
|
Scouring Chemical Inject
|
3 Min
|
Fabric Load
|
20 Min
|
Caustic Dosing
|
8 Min
|
Tem Up, Scouring (98X45)
|
50 Min
|
Tem Down ,Drain
|
8 Min
|
Wash
|
15 Min
|
Fill + Normal Hot + Wash
|
25 Min
|
Fill + PR Inject + Run 10 Min + Wash
|
25 Min
|
Fill + Acid Inject + Run 10 Min
|
14 Min
|
Enzyme + (Hot 80X10Min) + Wash
|
70 Min
|
Fill + Leveling + Salt Inject
+ Run 10 Min
|
20 Min
|
Color Dosing 25 Min + Run 10 Min
|
35 Min
|
Migration
|
40 Min
|
Soda Dosing
|
45 Min
|
Color Steam 60 Min + B/D + Wash 10 Min
|
80 Min
|
Fill + Acid + Run 10 Min + Drain
|
14 Min
|
Fill + Soaping Inject + Run
|
70 Min (Maximum)
|
Wash 2 X 10 Min
|
30 Min
|
Fill + Fixing + Drain
|
25 Min
|
Softener Dosing + Run Time
|
30 Min
|
Unload + Water Drain
|
20 Min
|
Total Time
|
650 Min/10 hr 50 min
|
Standard Operating Time(For Bio-Scouring Black
Color)
Operation
|
Time
|
Water Fill
|
3 Min
|
Fabric Load
|
20 Min
|
Acid Inject + Run 10 Min
|
12 Min
|
Scouring Chemical Inject
|
3 Min
|
Scouring (60X60) Tem Up( 90X20)
|
100 Min
|
Temp Down + Drain + Wash
|
20 Min
|
Fill + Leveling + Salt Inject
+ Run 10 Min
|
20 Min
|
Color Dosing 25 Min + Run 10 Min
|
35 Min
|
Alkali Dosing
|
50 Min
|
Color Steam 60 Min + B/D + Wash 10 Min (2 Time)
|
100 Min
|
Fill + Acid + Run 10 Min + Drain
|
14 Min
|
Fill + Soaping Inject + Run
|
80 Min (Maximum)
|
Wash 2 X 10 Min
|
30 Min
|
Fill + Fixing + Drain
|
25 Min
|
Softener Dosing + Run Time
|
30 Min
|
Unload + Water Drain
|
20 Min
|
Total Time
|
562 Min/9hr 22 min
|
Standard Operating Time(For CTN White Color)
Operation
|
Time
|
Water Fill
|
3 Min
|
Scouring Chemical Inject
|
3 Min
|
Fabric Load
|
20 Min
|
Caustic Dosing
|
8 Min
|
Brightener Dosing 80 X 20
|
20 Min
|
Tem Up 100 X 40
|
50 Min
|
Tem Down + Drain + Wash
|
20 Min
|
Fill + Normal Hot + Wash
|
25 Min
|
Fill + Acid Inject + Run 10 Min
|
14 Min
|
Enzyme + (Hot 80X10Min) + Wash
|
70 Min
|
Wash
|
15 Min
|
Unload
|
20 Min
|
Total Time
|
268 Min/4hr 28 min
|
Standard Operating Time(For Polyester White Color)
Operation
|
Time
|
Water Fill
|
3 Min
|
Fabric Load
|
20 Min
|
Oxalic Acid Inject
|
3 Min
|
Tem Up 70 X 20 + Drain
|
30 Min
|
Fill + Wash
|
20 Min
|
Fill + Pre-Treatment Chemical Inject
|
5 Min
|
Caustic Dosing
|
8 Min
|
Tem Up 90 X 20
|
25 Min
|
Tem Down + Drain
|
10 Min
|
Fill + Normal Hot + Drain
|
20 Min
|
Fill + Wash + Drain
|
20 Min
|
Fill + Acid Inject + Run 10 Min + Drain
|
14 Min
|
Fill + Leveling + Brightener Dosing 30Min
|
35 Min
|
Temp Up 130 X 30
|
90 Min
|
Cooling 80 C + Drain
|
40 Min
|
Wash
|
15 Min
|
Unload
|
20 Min
|
Total Time
|
378 Min/6hr 18 min
|
Standard Operating Time(For Polyester Black Color)
Operation
|
Time
|
Water Fill
|
3 Min
|
Fabric Load
|
20 Min
|
Fill + Leveling + Color Dosing 30Min
|
40 Min
|
Temp Up 135 , Run 70 min
|
140 Min
|
Cooling 80 C + Drain
|
45 Min
|
Wash
|
15 Min
|
Reduction 1 + Wash
|
60 Min
|
Reduction 2 + Wash
|
60 Min
|
Fill + Acid Wash + Drain
|
20 Min
|
Unload
|
20 Min
|
Total Time
|
423 Min/7 hr
|
Standard Operating Time(For CVC Deep Color)
Operation
|
Time
|
Water Fill
|
3 Min
|
Fabric Load
|
20 Min
|
Pre-Treatment Chemical Inject 80 X 20 min + Drain
|
30 Min
|
Wash 10 min
|
15 Min
|
Fill + Leveling Inject + Color dosing 30 min
|
40 Min
|
Temp Up 130 , Run 60 min
|
125 Min
|
Cooling 80 C + Drain
|
40 Min
|
Wash
|
15 Min
|
Reduction 1 + Wash
|
60 Min
|
Scouring Chemical Inject
|
3 Min
|
Caustic Dosing
|
8 Min
|
Tem Up, Scouring (98X40)
|
45 Min
|
Tem Down ,Drain
|
8 Min
|
Wash
|
15 Min
|
Fill + PR Inject + Run 10 Min +
Wash
|
25 Min
|
Fill + Acid Inject + Run 10 Min
|
14 Min
|
Enzyme + (Hot 80X10Min) + Wash
|
70 Min
|
Fill + Leveling + Salt Inject
+ Run 10 Min
|
20 Min
|
Color Dosing 25 Min + Run 10 Min
|
35 Min
|
Soda Dosing
|
45 Min
|
Color Steam 60 Min + B/D + Wash 10 Min
|
80 Min
|
Fill + Acid + Run 10 Min + Drain
|
14 Min
|
Fill + Soaping Inject + Run
|
70 Min (Maximum)
|
Wash 2 X 10 Min
|
30 Min
|
Fill + Fixing + Drain
|
25 Min
|
Softener Dosing + Run Time
|
30 Min
|
Unload + Water Drain
|
20 Min
|
Total Time
|
905 Min/15 hr 5 min
|